the left foot drive from jerry (JAG)

the idea is to put 6 screws through the foot into the screw threads on the foot drive's steel frame
we need to make that to drill the feet...

here is the place where the drills will be


the foot drive installed will be like this after our work

first step, place the foot drive and mark the drills positions

for the beginning, I've used few smalls drills from 2mm to 6,5mm
at each step, i've used a drill a little bigger to enlarge the hole

don't forget to have a look at each step that everything is correctly done

and finally, after few drilling steps, i've got that

before screwing on everything, let's adjust the 2" omniball

and adjust the bracket and the belt

and a last picture from the top after the installation
No comments:
Post a Comment